News · Road and rail

ADR / RID 2025 → 2027

Find a UN number or topic and prepare the change log for your products: what changes, when is planned, and what should be reviewed by the safety adviser.

Preparation for 2027. Entry scheduled for January 1, 2027. The sources consulted do not yet allow to present the depositary closure as confirmed. In RID the period of objections remains open until November 17, 2026. Each sheet distinguishes the official contrast from the data pending revision. The official text always prevails.

You can type 12 to search for UN 0012. A search without coincidences does not mean that there are no changes. Also check the general provisions.

Coverage, method and limits

ADR: The 238 Vektor v2026.09.1 records (231 column changes and 7 complete input events) are imported. The contrasted amendment instructions are individually identified; the rest retains the pending revision status. The entire BAM base has not been independently re-audited. The compared values are those of the affected field, not necessarily the full row.

RID: independent comparison of the adopted text of 28 May 2026 with RID 2025, with encoded changes of Table A, input events and a selection of general changes of practical interest. It is not an integral reproduction of the 100 pages of amendments. The variants and conditions indicated by OTIF are preserved.

The notes describe checks for the safety adviser. They identify any impact or transitional provision still to be assessed. They do not calculate exemptions automatically or confirm whether an operation is permitted. Original technical names are retained in English where no reviewed translation is available.

Official sources